Round Bottom Bridge Replacement, C106-4.18

Project Scope:

This project will involve the replacement of the existing three span concrete box-beam bridge spanning the East Fork of the Little Miami River near the Round Bottom Road intersection with US 50 in Union and Miami Townships, Clermont County, Ohio. Design considerations include the complete replacement of the existing abutment walls and deck and evaluations concerning the rehabilitation of the existing piers, replacement of the existing piers, or other options as feasible.  The project also involves the relocation of the existing water main currently attached to the west side of the superstructure and stream gage relocation (north side of the structure).  Finally, consideration should be given to the southwest approach near Binning Road to correct existing roadway geometric problems.

Start of Construction:


Community Benefit:

Estimated Completion Date:


Estimated Construction Cost:


Project Documents:


L.O.I. No. 11- CLE - Roundbottom Bridge Replacement
LBR Funding Approval
Existing Bridge Plans
Existing Watermain Bracket Plans