Branch Hill Guinea & SR 28 Improvements |
Project Scope: The 2,400 foot long project provided:
- One 12-foot travel lane in each direction plus one 12-foot center auxiliary turn lane
- 4-foot paved shoulders and concrete curb
- One 5.5-foot wide concrete sidewalk (on the NE side of Branch Hill Guinea Pike)
- An enclosed storm sewer system to improve drainage / collection of rain water
- Minor modifications to the traffic signal at SR 28 and Branch Hill Guinea Pike
|
Construction Timing:
Completed |
Community Benefit: The project reduced congestion and minimized travel delays in the
area by providing additional storage space for turn lanes on Branch Hill Guinea Pike
and making other related improvements. |
Construction Cost: $1,952,450 |
Project Documents:
|
|
Project Status:This project is completed!
|