PROJECT SCOPE:
The 2,400 foot long project provided: - One 12-foot travel lane in each direction plus one 12-foot center auxiliary turn lane
- 4-foot paved shoulders and concrete curb
- One 5.5-foot wide concrete sidewalk (on the NE side of Branch Hill Guinea Pike)
- An enclosed storm sewer system to improve drainage / collection of rain water
- Minor modifications to the traffic signal at SR 28 and Branch Hill Guinea Pike
|
CONSTRUCTION TIMING:
Completed
|
COMMUNITY BENEFIT:
The project reduced congestion and minimized travel delays in the area by providing additional storage space for turn lanes on Branch Hill Guinea Pike and making other related improvements.
|
CONSTRUCTION COST:
$1,952,450
|
PROJECT DOCUMENTS:
Bidders List 7-24-13 Bid Results
|
|
|
|
PROJECT STATUS:
This project is completed!
|
|